Friday, July 16, 2010

Almost There

Yes, the remodeling of the kitchen is almost finished. We are really tired of living with the dining room in our living room and having to eat in the motor home. Thank heavens we had the motor home to fix meals in or we probably would have had to move out. So, just a little bit more trim work to do and then he moves onto the dining room next week. He'll be replacing some of the hard wood flooring, then sanding it all down and refinishing it. I think we will be out of the house for most of that work.

This side of the kitchen used to have a breakfast bar which we never used except as a catch all for junk. Now a wonderful new pantry and a beverage fridge.

New cabinets, canned lights and granite counter tops, I can't wait until I can get in here and start cooking.

The Dining room that still needs a lot of help.

This week has been my week to get my Bellevue Teachers submission into the Bead Factory. After last weeks successful teaching gig at the Puget Sound Bead Festival, I decided to try for three classes at the Bellevue Bead show. I should know by the end of the week if I get in.

Here is a peak of my newest tree design. It is called the Tree of Hope and Life.

I had a lot of fun making these.

I hope everyone has a great weekend. 

2 comments:

  1. Anonymous10:18 AM

    Oh, Dana...that looks so gorgeous!!!!! I'm jealous :)

    ReplyDelete
  2. "Dana's Jewelry Designs" has been included in a special edition Thinking of Christmas Gifts in July Sites To See. I hope this helps to attract many new customers here.

    http://asthecrackerheadcrumbles.blogspot.com/2010/07/thinking-of-christmas-gifts-in-july_25.html

    ReplyDelete

LinkWithin

Blog Widget by LinkWithin